The Boston Chapter of the National Electrical Contractors Association (NECA) The Boston Chapter of the National Electrical Contractors Association (NECA)
Skip to content
  • About
    • President’s Message
    • Leadership
    • Chapter Staff
    • NECA National
  • Resources
    • Contractor Compliance
    • Government Affairs
    • NECA National
    • Business Development
    • Legal Counsel
    • Diversity, Equity & Inclusion
    • Education
    • Safety
    • Advocacy
    • Labor Relations
  • Markets We Serve
    • Featured Projects
    • Residential
    • Commercial
    • Transportation
    • Healthcare
    • Industrial
    • Utility
    • Institutional
    • Telecommunications / System Integration
    • Low-Voltage / Security
    • Green Building
  • Find a Contractor
  • Calendar
  • Join
  • Members Only
(617) 969-2521
2 Heritage Drive, Suite 1 Quincy, MA 02171
info@bostonneca.org
  • News
  • COVID-19 RESOURCE CENTER
  • Contact

Featured Projects

Boston Hope Hospital In the emergent, fast track conversion Boston Convention and Exhibition Center (BCEC) into a temporary 1,000 bed field hospital for COVID-19 patient care. Lan-Tel Communications has installed the facility's phones to the network allowing for internal communications. Read more →
Cathedral of the Holy Cross The historic renovation of the Cathedral of the Holy Cross entailed the highly detailed retrofitting and installation of the Cathedral’s lighting to LED light fixtures and lighting controls system. In addition to the scope, McDonald Electrical installed a security system along with the A/V system for Catholic TV. Read more →
One Congress The project at One Congress, the centerpiece building of Bulfinch Crossing development, involves the installation of core and shell electrical. The installation accommodates the entire 600-foot, 43-story office tower and will be LEED Gold Certified. One Congress will have 1,000,000 sq. ft. office space; future headquarters for anchor tenant State Street Corporation. Read more →
Ted Williams Tunnel Lighting Replacement The project at Ted Williams Tunnel consisted of replacing the existing lighting system with new LED fixtures and hardware. J & F White Contracting installed supports and new conduits for tunnel lighting system, with upgraded LED lighting to improve driving conditions. Ted Williams Tunnel’s new light system will be more energy efficient and require less maintenance. Read more →
Acorda Therapeutics Acorda Therapeutics’ nitrogen train distributing gas throughout the facility. The train’s pneumatically controlled valves are monitored electrically by JM Electrical Company, Inc. Read more →
Solar Landfill Aldon Electric, Inc., based in Weymouth, MA, has completed electrical construction of the 5.8MW, ground-mount solar (PV) project on a 12-acre capped landfill, a Superfund Site, located at 50 MBTA Access Road in Ashland, MA. The utility-scale solar project is comprised of the installation of 15,562 ballast-mounted PV modules manufactured by Boviet Solar USA, and 26 combiners which feed into 3 central solar inverters. Aldon Electric’s PM John Michael and Foreman Tony Michael headed the project team, managing a crew of 57 IBEW Local 96, Local 223 and Local 103 electricians in the fast-tracked three-month project. Read more →

About

  • President’s Message
  • Leadership
  • Chapter Staff
  • NECA National

Resources

  • Education
  • Safety
  • Advocacy
  • Labor Relations

Markets We Serve

  • Featured Projects
  • Residential
  • Commercial
  • Transportation
  • Healthcare
  • Industrial
  • Utility
  • Institutional
  • Telecommunications / System Integration
  • Low-Voltage / Security
  • Green Building

News

  • Contractor Spotlight
  • In the Media
  • NECA National News

Find a Contractor

  • Searchable Directory

Join

  • Membership Info

Calendar

  • Monthly Calendar

Contact

  • Contact Us
update-logo

Electrical Contractors Association of Greater Boston, Inc.
NECA Boston Chapter

2 Heritage Drive, Suite 1
Quincy, MA 02171
T: (617) 969-2521
F: (617) 969-5455
E: info@bostonneca.org

